Friday 11 November 2011

Final Alteration

THE FINAL ALTERATION
The final thing to do, to complete the alterations was to push the lower residential floor into the mountain to complete the sharing of the light well running acroos the back wall of both residential floors.

ORIGINAL BUILDING WITH CAFE LEVEL SITTING IN BETWEEN THE RESIDENTIAL FLOORS


THE FINAL RESULT, WITH THE CAFE LEVEL NOW BELOW THE SECOND RESIDENTIAL LEVEL. THE SECOND RESIDENTIAL LEVEL IS NOW PUSHED BACK INTO THE LANDSCAPE AS YOU CAN SEE

No comments:

Post a Comment